Primer Course 6: Commissioning, Installation and Start-up of Offshore Production Facilities

by
5749 5749 people viewed this event.

COURSE OVERVIEW

Success in handing over a completely commissioned facility (such as a Drilling Rig or FPSO) to the operator, whether a new build or modification, is contingent upon the completion of numerous phases of the project, from the front end design and engineering through fabrication and final commissioning.

Before final hook-up and installation of an FPSO can be accomplished, three interrelated phases are undertaken:

  • Mechanical Completion
  • Pre-Commissioning
  • Commissioning

Planning for them is critical to the schedule adherence, cost containment, successful installation and ultimate handoff for operation of the facility.

Production Hosts (and Drilling Rigs) are only part of a Field Facility. Subsea Production equipment must be properly designed or specified and Installed in the Field. Eventually all this equipment must be Started-Up in a correct sequence.
Case Studies and videos will be used to illustrate lessons learned from past successful projects. A CDROM of the powerpoint presentation pdfs in colour will be distributed with the lecture materials.

 

WHO SHOULD ATTEND

Shipyards, Oil Rig-building yards, FPSO Construction Yards, subcontractors and equipment suppliers, offshore production and installation companies, offshore construction companies and service providers, and marine & offshore related SMEs personnel involved in design & engineering, planning, procurement, project management, engineering production, vessel construction, commercial, commissioning and administration.

 

COURSE CONTENT

  • Introduction to Offshore Oil & Gas Production
  • Planning for Commissioning and Installation Activities
  • Construction and Commissioning FPSOs or Jacket Platforms
  • Construction and Commissioning Drilling Rigs
  • Selection of Subsea Field Equipment
  • Installation of Field Production Equipment
  • Examples of Commissioning and Installation Activities.
  • Field And FPSO Start-Up
  • Role of the Offshore Installation Manager and other Key Posts.

For more information, please contact Ms Vimala Govindasamy at +65 6460 8262 or vig@np.edu.sg.

Additional Details

Contact Person - Ms Vimala Govindasamy

Contact Number - +65 6460 8262

Organizer - COI-MOT, Ngee Ann Polytechnic

 

Date And Time

25 Sep 2014 @ 09:00 AM to
26 Sep 2014 @ 04:00 PM
 

Event Types

 

Event Category

 
Download Events iCal

Share With Friends